top of page
Need help selecting the right FLEXAMAT? Try out Product Recommender.

Low Water Crossings
Installation of Flexamat for low water crossings utilized by the US Forest Service and NRCS.
The Angeles Forest Service maintains a stretch of maintenance and access roads near the Pacific Crest Trailhead in Santa Clarita, CA. The project involved rehabilitation of two low water crossings, which were experiencing heavy erosion as a result of recent wildfires. The Forestry had originally designed the two crossings with a combination of rip rap and concrete. Flexamat offered the Forest Service and NRCS a cost-saving alternative to their design which resulted in a quicker installation and a more natural look.
Project Details
Location:
Western USA
Installation Date:
November 2020
Product:
Flexamat Plus UV-T
Quantity:
10,650 SF
bottom of page